Client: SOCAR Midstream Operations Ltd
Contract Name: Provision of Civil, Structural, Mechanical Fabrication, Mechanical Construction, ICE
2021-ongoing
Projects:
Hazardous and Waste Material Shelter Construction at CSG1 Project
In order to provide proper storage of various materials, as well as to reduce environmental risks arising from improper storage of chemicals and hazardous materials, the client has decided to design and construct a new waste shelter at the CSG1 facility. The shelter should be made from a steel structure. The shelter should be provided with a reinforced concrete slab. One side of the shelter should be open to provide free entrance and ventilation. The overall shelter dimensions should be 12.5m x 6.5m. The main and all associated structural elements should have corrosion protection. The slab surfaces should be easy to clean and anti-skid.
Site Survey/Activities for Noise Reduction Actions at CSG2 Accommodation Project
According to a comprehensive study conducted by the Health, Safety, and Environment (HSE) team, there is a significant issue at the CSG-2 site involving intermittent high noise levels. These noises are primarily emanating from the instrument air compressor unit, along with other sources such as the HVAC systems. This noise pollution is adversely affecting the well-being of staff accommodated in the nearby building. To effectively verify and rectify this issue, the following detailed actions are required: Conduct Site Survey, Assess the Existing Noise Levels, Noise Mapping Preparation, Formulate and Provide Recommendations, and its Implementation Detailed Design.