Azfen LLC Georgia Branch
AZF-098 Project
Project Name: Production, Construction, Civil Building Works, and Repair of Electrical Equipment and Devices in the Republic of Georgia
Client: BP EXPLORATION (Caspian Sea) LTD
Contract Name: MASTER AGREEMENT FOR ENGINEERING, PROCUREMENT AND CONSTRUCTION SERVICES (EPC) FOR AGT ONSHORE PIPELINES OPERATION
2023-ongoing
Projects:
PS11, PS13 & PS15 WREP Infrastructure Upgrade Project
SOW is to upgrade the accommodation, office, and support facilities at BP PS11, PS13 & PS15 facilities along the Georgia Western Route Export Pipeline (WREP). These new facilities include accommodation block and office block with medical room, security room, and all associated utilities, site amenities, and related civil, electrical, piping, and mechanical scope sufficient to deliver a fully functioning camp under a Lump Sum Turn-key (LSTK) Design & Build contracting model.
Solar Panels & Grid Power for Georgia BTC pipeline Block Valves Project
SOW consists of Lump Sum Turn-key (LSTK) Design & Build EPC services for installation of the Solar Panel System and connection to the Grid Power on 14 Block Valve Stations at the Georgian section of BTC/SCP pipelines.
WREP KP141+600 Liakhvi River Crossing Remediation Project
SOW consists of remediation work at the Western Route Export Pipeline (WREP) ROW KP141+600, which crosses with the Liakhvi River in Georgia. The Liakhvi RVX Remediation Project consists of 2 parts: Part 1 contains repair of existing damaged rip-rap sill, installation of new sill downstream of the river’s right bank up to the state Melioration pipeline crossing, leveling of islands, and vegetation clearance. Part 2 contains the installation of new rip-rap sill downstream of the right bank of river crossing, leveling of islands, vegetation clearance, removal of spoil over WREP, and repair of the railway embankment.
SUPSA Terminal ESS (Electronic Security System) Upgrade Project
SOW is the replacement and upgrade of WREP Supsa Oil Terminal Electronic Security Systems (ESS) containing CCTV System, Access Control System (ACS), and Perimeter Intrusion Detection System (IDS).
Supsa Terminal COST A, B, C, and D Site Coating Repair Project
The scope of work consists of recoating the Storage Tanks COST A, B, C, and D, each of 40,000 tons capacity, located in Supsa Terminal.
Supsa Terminal Warehouse Renewal Project
BP Georgia plans to build a new Warehouse building at Supsa Oil Terminal to replace two existing warehouses. The contract has been awarded to Azfen Georgia Branch. The scope includes architectural, civil, structural works, and auxiliary systems and utilities.
BTC/SCP OF-PIDS System Installation Project
SOW includes the installation of a new Distributed Acoustic Sensing Intrusion Detection System (OF-PIDS) across BTC/SCP pipelines.
Georgia/Azerbaijan BVs PLC & IO Cards Upgrade Project
SOW includes PLC replacement at BV stations in Azerbaijan (19) and Georgia (15), covering EPC services.