Clients

123

British Petroleum (BP)

BP is the operator of the Sangachal Terminal Expansion Programme. AZFEN and TEKFEN handle the construction works for this project. Success will be a product of the mutual respect and trust between BP and AZFEN. Compression and Water Injection Platform, and Production Compression Water Injection and Utilities Platforms are the other large projects where AZFEN participates with AMEC and TEKFEN.

123

Azerbaijan International Operating Company (AIOC)

AIOC was our first client. From the day our first agreement was signed in 1996, we have realized a number of successful projects, while some are still ongoing. These projects include the Full Field Development Project, Sangachal Terminal Expansion Programme, and the Early Oil Project.

123

SOCAR

Sangachal - Gazimammad 1220 mm 48" gas pipeline construction began on 1 November 2006. This pipeline will provide transportation of Shahdeniz gas through the country. The construction owner is Gas Operations Department of SOCAR. Azfen successfully carries construction works and on 15 June 2007 it will be fully put into operation.

123

Amec

Amec Process and Energy limited, Çıraq 1 platformu Su İnjeksiyası sisteminin emalatı və quraşdırılması layihəsində sifarişçimiz olmuşdur. Layihə 1999-da başlamış və 2000-ci ildə uğurla başa çatdırılmışdır. Layihəyə, ofşorda, Çıraq 1 platformasinda quraşdırılacaq bütün tikinti poladının və emal edilmiş spulların montaj işləri də daxil idi. Bütün işlər Tekfenlə alyans şəklində həyata keçirilmişdir.
123

Saipem

Within the ACG Project, Saipem is in charge of the installation and transport of the Jackets and Topsides. This includes asset refurbishment for the project's operations. In 2002, AZFEN signed a number of fabrication, installation, maintenance service agreements with Saipem.
123

Toyo Engineering Corporation

Toyo Engineering Corporation is another client. Our work with Toyo consisted of the construction of the pipeline portion of the Azerigaz Pipeline Project in Azerbaijan. The contract included construction, installation, and completion of the project. This work was carried out in 2002.
123

Georgian Pipeline Company(GPC)

The Azfen scope in the Western Route Project Pressure Reducing Station and Pump Stations in Georgia was construction of 2 Pressure reducing stations. The stations were located at 200 m and 900 m altitudes and under the influence of harsh climatic conditions, such as temperatures varifying from -15C to +40C, continuous rain and snow. However, the Project lasted 10 months and was completed on time in 1998.
123

WorleyParsons

11